Statement of need for building design and construction
The client's statement of need is part of an ongoing process of defining their requirements:
The statement of need describes the client's possible requirements in outline, which at this stage may or may not result in the need for a project. It may include the following information:
- A description of the business need that may result in a project.
- An assessment of how it will contribute to the corporate strategy.
- An analysis of the high level options (such as do something, do nothing, new build, extend, refurbish, relocate, change the way the organisation works, etc.).
- A description of the nature of the client, and its history.
- A description of the nature of client's operations.
- Information about existing premises and likely future requirements.
- The assumed budget (and the basis for the budget).
- The assumed programme.
- An assessment of the potential for future changes.
The statement of need is likely to be in a report format, however, where possible, information and requirements should be scheduled in a database or spreadsheet that will be easy to expand and will be easy to use to test whether proposals satisfy requirements later in the project.
If independent client advisers are to be appointed to assist with preparing a more detailed 'strategic brief' and to assess the feasibility of the proposed project, the nature of their role and scope of services may be based on the project description in the statement of need.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.